Nexii Deconstruction Case Study

The case study leverages the latest findings in Light House’s research on Design for Disassembly (DfD) and construction waste. The study showcases the successes and challenges, along with embodied carbon and cost comparisons, between traditional demolition and deconstruction and the Nexii building system. These findings are coupled with observations that support a circular construction ecosystem.
January 31, 2022 (Revised February 1, 2022)